Hit Counter

 

 

WORK HAS BEGUN ON KITTY'S  1951 CHEVY 3100 PICK-UP

 

TOP, FRONT AND DRIVER SIDE NOW GROUND DOWN TO METAL

THE SHINNY METAL PARTS WILL GET BLACK POR-15 (RUST PREVENTION) AND YELLOW PRIMER PUT ON

 

BODY WORK IS ALMOST COMPLETE

 

DRIVER DOOR TO BE FINISHED TODAY, AREA AHEAD OF DOOR TOMORROW

NEXT STEP IS TO LIFT OFF BED AND CAB AND BEGIN WORK ON FRAME

BODY IS NOW COMPLETE

ENGINE & TRANNY ARE NOW OUT AND BEING REBUILT

BODY OFF FRAME GROUND, SANDED, PAINTED WITH POR-15

FIREWALL NEEDS TREATMENT THEN ALL MATING SURFACES PRE PAINTED

AND REASSEMBLY WILL BEGIN. THEN FINAL BODY WORK AND PAINT

FOLLOWED BY NEW WOOD IN BED.

PICTURE OF OUR NEW LOCATION THE BUILDING IS VERY DEEP

GERARDO & JORGE AFTER PAINTING WILL TAKE MORE PICTURES OUTSIDE IN THE LIGHT

NOTICE THE REFLECTIONS, AND IT HASN'T EVEN BEEN WET SANDED OR BUFFED YET.  WE WET SAND AND THEN GO THROUGH A 3 STAGE BUFFING AND THEN GLAZE, BEFORE WE CALL IT DONE.

 

ENGINE & TRANNY BACK FROM BUSS AND READY FOR INSTALL

ENGINE  & TRANNY INSTALLED IN TRUCK

 

 

WOOD BED STAINED & FINISHED, SET IN READY FOR BOLTING DOWN

 WE CLOSED OUR BUSINESS MAY 31 2009

 

 

  

 SEND US AN E-MAIL BY CLICKING ON THESE WORDS

mastercard.jpg (3183 bytes)            visa.jpg (2667 bytes)         discover.jpg (2998 bytes)      americanexp.jpg (2095 bytes)      verisignsealwhite.gif (7123 bytes)     wpe1.jpg (2711 bytes)